The analysis of schemes of temperature control in winter of the JiangPing river’s emptying tunnel of the compressive and the tunnel protal section of lining concrete

China Rural Water and Hydropower ›› 2011 ›› (6) : 117-120.

The analysis of schemes of temperature control in winter of the JiangPing river’s emptying tunnel of the compressive and the tunnel protal section of lining concrete

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}. {{journal.qiKanMingCheng_EN}}. 2011, 0(6): 117-120

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}

Accesses

Citation

Detail

Sections
Recommended

/