Construction Timing Optimization for In-situ Rehabilitation of Urban Box Culverts: An Integrated AHP-OPA Multi-Criteria Decision-Making Approach

CHEN Long, LIU Quan, LUO Li-zhe, TAN Fu-hang, ZHANG Xiao-lei, ZHANG Meng

PDF(1161 KB)
China Rural Water and Hydropower ›› 2026 ›› (5) : 241-245. DOI: 10.12396/znsd.2500929

Construction Timing Optimization for In-situ Rehabilitation of Urban Box Culverts: An Integrated AHP-OPA Multi-Criteria Decision-Making Approach

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}. {{journal.qiKanMingCheng_EN}}. 2026, 0(5): 241-245 https://doi.org/10.12396/znsd.2500929

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(1161 KB)

Accesses

Citation

Detail

Sections
Recommended

/