Research on the Joint Operation Scheme of Wangyu River's West Bank Controlling Project and Zoumatang Canal Dredging and Expansion Project

LU Zhi-Hua,LI Min,CHEN Jun,CAI Mei ,GONG Li-li,WANG Yuan-yuan

PDF(409 KB)
China Rural Water and Hydropower ›› 2017 ›› (9) : 77-80.

Research on the Joint Operation Scheme of Wangyu River's West Bank Controlling Project and Zoumatang Canal Dredging and Expansion Project

  • LU Zhi-Hua1,LI Min1,CHEN Jun2,CAI Mei1 ,GONG Li-li1,WANG Yuan-yuan1
Author information +
History +

Abstract

With the completion and operation of Zoumatang Canal dredging and expansion project,the boundary condition of water diversion project from the Yangtze to Taihu has changed. Based on requirement analysis of joint operation of Wangyu River's west bank controlling project and Zoumatang Canal dredging and expansion project,in order to meet the needs of the Taihu Basin and the improvement of regional scale demand,this paper designs some joint operation schemes of Wangyu River's west bank controlling project and Zoumatang Canal dredging and expansion project,analyzes the effect of these schemes by using the water quantity and quality model of Taihu Basin,proposes the recommended optimal joint operation schemes,which can provide a reference for the scheduling optimization of Wangyu River project and regional related projects.

Cite this article

Download Citations
LU Zhi-Hua,LI Min,CHEN Jun,CAI Mei ,GONG Li-li,WANG Yuan-yuan. Research on the Joint Operation Scheme of Wangyu River's West Bank Controlling Project and Zoumatang Canal Dredging and Expansion Project. China Rural Water and Hydropower. 2017, 0(9): 77-80

References

[1] 吴巍巍. 走马塘拓浚延伸工程对望虞河西岸地区水环境的影响研究[J]. 中国农村水利水电,2013,(09):20-22.
[2] 上海勘测设计研究院. 望虞河西岸控制工程可行性研究报告[R]. 上海:上海勘测设计研究院,2009-5.
[3] 上海勘测设计研究院. 走马塘拓浚延伸工程可行性研究报告[R]. 上海:上海勘测设计研究院,2009-4.
[4] 太湖流域管理局水利发展研究中心. 引江济太期间走马塘拓浚延伸工程调度方案复核分析报告[R]. 上海:太湖流域管理局水利发展研究中心,2015-3.
PDF(409 KB)

440

Accesses

0

Citation

Detail

Sections
Recommended

/