Research on the Joint Operation Scheme of Wangyu River's West Bank Controlling Project and Zoumatang Canal Dredging and Expansion Project
LU Zhi-Hua1,LI Min1,CHEN Jun2,CAI Mei1
,GONG Li-li1,WANG Yuan-yuan1
Author information+
1. Water Conservancy Development Research Center of Taihu Basin Authority,Ministry of Water Resources,Shanghai 200434,China;
2. Changzhou Branch,Jiangsu Hydrology and Water Resources Survey Bureau,Changzhou 213000,Jiangsu Province,China
{{custom_zuoZheDiZhi}}
{{custom_authorNodes}}
Collapse
History+
Received
Revised
Published
2017-03-22
2017-04-21
2017-09-15
Issue Date
2020-04-26
Abstract
With the completion and operation of Zoumatang Canal dredging and expansion project,the boundary condition of water diversion project from the Yangtze to Taihu has changed. Based on requirement analysis of joint operation of Wangyu River's west bank controlling project and Zoumatang Canal dredging and expansion project,in order to meet the needs of the Taihu Basin and the improvement of regional scale demand,this paper designs some joint operation schemes of Wangyu River's west bank controlling project and Zoumatang Canal dredging and expansion project,analyzes the effect of these schemes by using the water quantity and quality model of Taihu Basin,proposes the recommended optimal joint operation schemes,which can provide a reference for the scheduling optimization of Wangyu River project and regional related projects.
LU Zhi-Hua,LI Min,CHEN Jun,CAI Mei
,GONG Li-li,WANG Yuan-yuan.
Research on the Joint Operation Scheme of Wangyu River's West Bank Controlling Project and Zoumatang Canal Dredging and Expansion Project. China Rural Water and Hydropower. 2017, 0(9): 77-80