Long Term Optimization Scheduling Strategy for Cascaded Small Hydropower Stations in Remote Rural Areas
PAN Chang-ning, ZENG Qian-cheng, SU Zhi-yin, HUANG Zi-han, ZENG Jin-hui, LIU Jie
China Rural Water and Hydropower . 2024, (10): 143 -150 .  DOI: 10.12396/znsd.240223