|
Research Model and Method for the Competitive Relationship between Power Generation and Peak Shaving Targets in Long-term Scheduling of Cascade Hydropower Stations
China Rural Water and Hydropower
.
2025, (4): 219
-223
.
DOI: 10.12396/znsd.241071
|
|