|
A Rapid Prediction Model for the First Water Filling of Long-Distance Water Diversion Projects Based on Quasi-Steady-State Approximation
China Rural Water and Hydropower
.
2026, (10): 182
-189
.
DOI: 10.12396/znsd.2600709
|
|