|
不同来水保证率下引洮供水工程受水区缺水优先序与风险分区研究
Study on Water Shortage Priority and Risk Zoning in the Water-receiving Area of the Yintao Water Supply Project Under Different Inflow Guarantee Rates
节水灌溉
.
2026, (10): 100
-106
.
DOI: 10.12396/jsgg.2026063
|
|