深水高土石围堰塑性混凝土防渗墙应力变形分析
李烽 田斌 卢晓春 杨金强
深水高土石围堰塑性混凝土防渗墙应力变形分析
Stress and Deformation Analysis of plastic concrete of cutoff wall in Deepwater High Earth-rock cofferdam
随着西部地区一些大型水利枢纽工程的兴建,需要在深水中填筑高土石围堰,其防渗墙的设计和施工对土石围堰安全运行至关重。采用非线性有限元法,基于邓肯?张E-?本构模型,结合乌东德水电站工程,分析其土石围堰应力变形规律,并根据施工过程和不同影响因素,进行多种方案比较,研究了塑性混凝土防渗墙在围堰施工运行过程中的工作性态变化,论证了围堰设计的合理性,为该围堰施工和安全运行提供了一定参考依据。
With the building of some large-scale water control project in the western region, it is needed to fill the high earth-rock cofferdam in the deepwater, the design and construction of the cutoff wall is important to the safe operation of the earth-rock cofferdam. Based on the constituve model of Duncan E-? and combining with the project, this paper analyzes the law of the stress and deformation of the earth-rock cofferdam by adopting the method of the nonlinear finite element. According to the construction process and different affecting factors, the paper also studies workability changes of the plastic concrete cutoff wall in the process of cofferdam construction by comparing a variety of project. It demonstrates the rationality of the design of the cofferdam, and provides certain reference to the safe construction and operation of the cofferdam.
土石围堰 / 本构模型 / 塑性混凝土 / 防渗墙 / 应力 / 变形 {{custom_keyword}} /
earth-rock cofferdam / constituve model / plastic concrete / cutoff wall / stress / deformation {{custom_keyword}} /
“十一五”国家科技支撑计划课题
[1]郑守仁,王世华,夏仲平,刘少林. 导流截流及围堰工程(下册)[M]. 北京:中国水利出版社,2005. [2]汪明元,陈敬虞,孙常青,陈云. 高水头下深厚覆盖层高土石围堰应力变形分析[A].第一届中国水利水电岩土力学与工程学 术讨论文会论文集[C],2006 [3]王清友,孙万功,熊欢. 塑性混凝土防渗墙[M]. 北京:中国水利水电出版社,2008. [4]杨广华,李广信,介玉新. 土的本构模型的广义位势理论及其应用[M]. 北京:中国水利水电出版社,2007. [5]戴会超,曹广晶,包承纲,杨文俊. 三峡工程导截流及深水高土石围堰研究[M]. 北京:科学出版社,2006. [6]孙开畅,田斌,蒋中明. 高水头作用下围堰堰体及防渗墙变形特性研究[J]. 人民长江,2011,42(5):74-77. [7]胡黎明,濮家骝. 施工及运行期三峡二期围堰防渗墙有限元分析[J]. 水利水电技术,1999,30(5):64-66. [8]李青云,程展林. 三峡工程二期围堰运行后的性状分析[J]. 岩土工程学报,2005,27(4):410-413. [9]熊欢,王清友,高希章等. 沙湾水电站一期围堰塑性混凝土防渗墙应力变形分析[J]. 水力发电学报,2010,29(2):197-203.
/
〈 |
|
〉 |