水库蓄水问题研究进展

刘颖 梅亚东 王现勋 李学海

PDF(95 KB)
中国农村水利水电 ›› 2018 ›› (1) : 111-114.
水文水资源

水库蓄水问题研究进展

  • 刘颖1,梅亚东1,王现勋1,李学海2
作者信息 +

Research Progress Influencing Factors and Water Storage of Reservoir Impoundment

  • LIU YING1 ,MEI Ya-dong1 ,WANG Xian-xun1 ,LI Xue-hai2
Author information +
稿件信息 +

摘要

水库蓄水分为常规运用蓄水和初期蓄水,常规蓄水时受来水、用水的限制,而初期蓄水是对新建工程的试验,还将受到工程因素的影响。水库蓄水涉及来水、用水和工程问题,因此,识别蓄水影响因素,协调好来水、用水与蓄水,分配水库的供、蓄水量,明确蓄水风险,制定合理的蓄水方案至关重要。基于此,本文针对水库蓄水影响因素和蓄水方案、蓄水风险等问题,在阅读前人文献的基础上,梳理国内外各学者对此问题的理论及实践研究、探讨其未来研究重点,以期为后续的水库蓄水研究提供参考。

Abstract

Reservoir impoundment was divided into conventional use of impoundment and initial impoundment, conventional use of impoundment would be affected by the inflow and downstream water demand, initial impoundment which examined these new projects would be affected by the engineering factors as well. Inflow, water demand and engineering problems were involved in the storage of reservoir, therefore, it was fatal to identify the influencing factors of reservoir impoundment, coordinate inflow, water consumption and impoundment, allocate the supplying and impoundage, definitude the risk of impoundment and formulate reasonable water storage scenario. Based on this, this paper concentrated on the problem that the influencing factors of reservoir impoundment and the risk and scheme of water impoundment, sorted out theoretical and practical research on this issue of domestic and foreign scholars, explored its future focus on the basis of the predecessors' studies, so as to provide reference for the subsequent reservoir water impoundment research.

关键词

水库蓄水 / 影响因素 / 蓄水方案 / 风险

Key words

reservoir impoundment / influencing factors / water impoundment scenario / risk

基金

国家重点研发计划课题( 2016YFC0401909) 

引用本文

导出引用
刘颖 梅亚东 王现勋 李学海. 水库蓄水问题研究进展[J].中国农村水利水电, 2018(1): 111-114
LIU YING, MEI Ya-dong , WANG Xian-xun, LI Xue-hai. Research Progress Influencing Factors and Water Storage of Reservoir Impoundment[J].China Rural Water and Hydropower, 2018(1): 111-114

参考文献

[1] 许小杰,曹 敏,孙伯永. 桐柏电站下库坝蓄水初期监测资料简 析[J].中国农村水利水电,2007,( 6) : 79-82. [2] 陈炯宏,徐 涛,李长春,等. 三峡水库蓄水期综合调度需求分析 [J]. 人民长江,2015,46( 21) : 1-4. 

[3] 景连才. 察尔森水库初期蓄水发电效益的研究[J]. 东北水利水 电,1989,2( 7) : 20-23. 

[4] 甘富万.三峡水库提前蓄水研究[D]. 武汉: 武汉大学,2005.

 [5] 左 建,陆宝宏,顾 磊,等. 基于综合调度的三峡水库汛末蓄水 研究[J]. 水力发电,2015,41( 12) : 85-92. [6] 杜 菁,李广宁.黄花寨水电站 2010 年提前下闸蓄水时机分析 [J].价值工程,2011,2( 15) : 197-198. 

[7] 钟式范,马水山,张保军. 隔河岩水利枢纽水库蓄水对岸坡稳定 性的影响[J]. 岩土力学与工程学报,1996,15( 3) : 282-288. 

[8] 王明华,晏鄂川. 水库蓄水对库岸滑坡的影响研究[J]. 岩土力 学,2007,28( 12) : 2 722-2 725. 

[9] 涂俊钦,钟红春,高兴中. 江垭水库大坝安全监测在蓄水初期的 分析应用[J].水电自动化与大坝监测,2003,27( 5) : 64-66. 

[10] 李太成,魏志远. 大型水电工程初期蓄水影响因素及其对策 [J]. 水力发电,2012,40( 4) : 85-87.

 [11] 陈 鹄. 工程索赔控制在白市水电站工程建设监理中的几点应 用与思考[J]. 中外建筑,2014,( 8) : 134-136. [12] 李红刚. 浅析小湾水电站初期蓄水[J]. 云南水力发电,2010,26 ( 6) : 5-7. 

[13] 李建乐,蔡 洁.金王寺水库初期蓄水方案研究[J].四川水利, 2016,( 1) : 81-84.

 [14] 王 炎,李英海,权 全,等.考虑生态流量约束的三峡水库汛 末提前蓄水方式研究[J].水资源与水工程学报,2016,27( 3) : 160-165. 

[15] 裴金林,刘怀汉. 三峡水库初期汛后蓄水兼顾坝下通航要求的 调度方案[J]. 水道港口,2006,27( 3) : 165-169.

 [16] 李雨.水库防洪和蓄水优化调度方法及应用[D]. 武汉: 武汉大 学,2013. 

[17] 闵要武,张 俊,邹红梅. 基于来水保证率的三峡水库蓄水调度 图研究[J]. 水文,2011,31( 3) : 27-30. [18] 李长春,喻 杉,丁 毅,等. 三峡水库蓄水期径流特性分析 [J]. 水电与新能源,2015,( 12) : 25-29.

 [19] 耿 旭,毛继新,晋碧瑄. 基于蓄满率的三峡水库蓄水时期研究 [J]. 泥沙研究,2016,( 1) : 31-36. 

[20] Karamouz M,Houck M. Annual and monthly reservoir operating rules generated by deterministic optimization[J]. Water Resource Reserch.1982,18( 5) : 1 337-1 344. 

[21] Simonovic S. Reservoir system analysis: closing gap between theory and practice[J]. Water Resource Plan Manage.1992,118( 3) : 262- 280.

[22] Oliveira R,Loucks DP. Operating rules for multi-reservoir system [J]. Water Resource Reserch.1997,33( 4) : 839-852. 

[23] Neelakantan T,Pundarikanthan N. Neural network-based simulation -optimization model for reservoir operation[J]. Water Resource Plan Manage.2000,126( 2) : 57-64. 

[24] Koutsoyiannis D,Economou A. Evaluation of the parameterization- simulation-optimization approach for the control of reservoir systems [J]. Water Resource Reserch.2003,39( 6) : 1-17. 

[25] 张国庆,肖 琳,赵英林.水电站水库初期蓄水的计算及方案选 择[J].水电能源科学,1992,10( 4) : 250-257. [26] Jay R. Lund. Some derived operating rules for reservoirs in series or in parallel[J]. Water Resources Planning and Management,2000, 126( 2) : 143-153. 

[27] Jay R. Lund. Derived power production and energy drawdown rules for reservoirs[J]. Water Resources Planning and Management. 1999,125( 3) : 143-153. 

[28] 万 俊,高革命,潘 旵,等. 考虑预报预泄时白盆珠水库汛期 蓄水运用方式研究[J]. 武汉大学学报( 工学版) ,2000,33( 1) : 10-13. 

[29] 刘心愿,郭生练,刘 攀,等.考虑综合利用要求的三峡水库提前蓄水方案[J].水科学进展,2009,20( 6) : 851-856. 

[30] 何小聪,丁 毅,李书飞. 基于等比例蓄水的长江中上游三座水 库群联合防洪调度策略[J]. 水电能源科学,2013,( 4) : 38-41. 

[31] Long L N,Madsen H,Dan R. Simulation and optimisation modelling approach for operation of the HoaBinh reservoir,Vietnam[J]. Journal of Hydrology,2007,336( 3-4) : 269-281. 

[32] Asfaw T D,Hashim A M. Development of Cascade Hydropower Reservoirs Operating System Rule Using Refill and Deplete Ranking Orders[J]. Advanced Materials Research,2012,433 - 440: 1 735 - 1 739. 

[33] Richter B D,Thomas G A. Restoring Environmental Flows by Modifying Dam Operations[J]. Ecology & Society,2007,12( 1) : 181 - 194. 

[34] 李琼芳,白 雪,陆国宾,等.三峡水库不同蓄水方案对于下游 生态径流的影响[J].水力发电学报,2011,30( 4) : 124-128. 

[35] 赵 越,周建中,张华杰,等.三峡水库提前蓄水对中华鲟产卵 的影响[J].水力发电学报,2013,32( 5) : 83-89. 

[36] 李义天,彭 杨,谢葆玲,等.三峡水库汛末蓄水方案比较[J]. 水电能源科学,2002,20( 1) : 9-11.

 [37] 李义天,甘富万,邓金运.三峡水库 9 月分旬控制蓄水初步研究 [J].水力发电学报,2006,25( 1) : 61-66. [38] 彭 杨,李义天,张红武.三峡水库汛末蓄水时间与目标决策研 究[J].水科学进展,2003,14( 6) : 682-689. [39] 汪 芸,郭生练,李天元.丹江口水库提前蓄水方案[J].武汉大 学学报( 工学版) ,2014,47( 4) : 433-439. [40] 周研来,郭生练,陈 进.溪洛渡-向家坝-三峡梯级水库联合蓄 水方案与多目标决策研究[J].水利学报,2015,46( 10) : 1 135-1 144. 

[41] 陈炯宏,傅巧萍,丁 毅,等.溪洛渡_向家坝水库与三峡水库联 合蓄水调度研究[J].人民长江,2016,47( 7) : 102-113. 

[42] 丁 毅,傅巧萍.长江上游梯级水库蓄水方式初步研究[J].人民 长江,2013,44( 10) : 72-75. 

[43] 彭 杨,纪昌明,刘 方.溪洛渡_向家坝梯级水库汛末蓄水时 间与目标决策研究[J].应用基础与工程科学学报,2014,22( 6) : 1 098-1 107. 

[44] 王 冬,李义天,邓金运等.长江上游梯级水库蓄水优化初步研 究[J].泥沙研究,2014,12( 2) : 62-67. 

[45] 叶 琰. 万安水库发电调度风险分析[D]. 武汉: 武汉大学, 2005. 

[46] 冯 平,陈根福,纪恩福,等. 岗南水库超汛限水位蓄水的风险 分析[J]. 天津大学学报自然科学与工程技术版,1995,( 4) : 572 -576.