详细介绍了水口电站5号机组改造转轮模型试验的主要项目及验收结果,模型验收试验结果表明水轮机模型转轮的各项性能指标均能满足合同要求,特别是其优秀的空化性能能保证水口电站水轮机增容至230MW的目的。
Abstract
The main items and results of model test for Unit 5 capacity expansion in Shuikou hydropower station are introduced in detail. The test result of model test acceptance indicates that all the performance parameters of the model runner meet the requirement of the Contract. Particularly, the cavitation performance are proved to be excellent and can guarantee that the unit’s capacity be expanded to 230MW.