水电站地下埋管回填脱空影响计算分析
申艳, 冯浩文, 黄永松
水电站地下埋管回填脱空影响计算分析
The Calculation and Analysis of the Effect of Backfill Cavity of the Underground Buried Pipe in Hydropower Stations
水电站地下埋管回填脱空的范围及深度,是埋管是否需要进行补充灌浆的重要参考依据。采用三维非线性有限单元法,选取了某工程具有代表性的管道,对钢管结构受力情况进行脱空范围和深度两方面的敏感性计算,将计算结果与材料的抗力限值进行对比分析,研究得出管道允许的脱空范围和深度,科学评价回填脱空范围及深度对钢管结构受力的影响。
Backfill empty phenomenon maybe happen after backfilling for underground penstocks of hydropower stations. The empty range and depth are important references for whether the underground penstocks need supplementary grouting. This paper selects representative pipelines of a certain project, and uses the three-dimensional non-linear finite element method to calculate the sensitivity of their stress conditions in terms of empty range and depth. Then the calculated results are compared with the resistance limit of the material to obtain the allowable empty range and depth of the steel pipe, and the impact of the backfill empty range and depth on the force of the steel pipe structure are scientifically evaluated.
地下埋管 / 脱空 / 接触灌浆 / 非线性有限元 / ANSYS {{custom_keyword}} /
underground penstock / backfill empty / contact grouting / nonlinear finite element / ANSYS {{custom_keyword}} /
表1 脱空边长效应分析计算参数及计算结果Tab.1 Calculation parameters and calculation results for the analysis of empty side length effect |
项目 | 1 | 2 | 3 |
---|---|---|---|
脱空弧长/m | 1.0 | 0.5 | 2.1 |
脱空轴线长/m | 1.05 | 2.10 | 0.50 |
脱空面积/m2 | 1.05 | 1.05 | 1.05 |
无脱空情况下钢衬的应力/MPa | 181 | 181 | 181 |
无脱空情况下钢衬的抗力限值/MPa | 276.4 | 276.4 | 276.4 |
无脱空情况下钢衬的径向位移/mm | 2.4 | 2.4 | 2.4 |
脱空部位钢衬表面最大Mises应力/MPa | 315 | 268 | 234 |
脱空情况下钢衬内外表面的抗力限值/MP | 276.4 | 276.4 | 276.4 |
脱空部位钢衬中面最大应力/MPa | 226 | 186 | 219 |
脱空情况下钢衬中面的抗力限值/MPa | 276.4 | 276.4 | 276.4 |
脱空情况下钢衬的径向位移/mm | 5.30 | 3.85 | 3.50 |
图2 脱空区内表面Mises应力云图(单位:MPa)Fig.2 Mises stress cloud diagram of the surface in the empty area |
图3 脱空区中面Mises应力云图(单位:MPa)Fig.3 Mises stress cloud diagram in the middle of the empty area |
图4 脱空区外表面Mises应力云图(单位:MPa)Fig.4 Mises stress cloud diagram on the outer surface of the empty area |
表2 脱空范围敏感性分析计算参数表Tab.2 Calculation parameter table for sensitivity analysis of empty range |
方案 | 部位 | 管道直径/ m | 设计内水压力/MPa | 围岩单位弹性抗力系数/ (kN·cm-3) | 钢材种类 | 钢板壁厚/ mm | 缝隙值/ mm |
---|---|---|---|---|---|---|---|
1 | 上平段(Ⅲ类围岩) | 5.8 | 1.32 | 3.0 | Q345R | 22 | 1.20 |
2 | 上平段(Ⅳ类围岩) | 5.8 | 1.32 | 1.0 | Q345R | 22 | 1.20 |
3 | 中平段(Ⅲ类围岩) | 5.8 | 3.89 | 3.0 | 07MnMoVR | 26 | 1.20 |
4 | 中平段(Ⅳ类围岩) | 5.8 | 3.89 | 1.0 | 07MnMoVR | 34 | 1.20 |
5 | 下平段 | 4.8 | 7.45 | 1.0 | Q690CF | 54 | 1.00 |
6 | 尾水支管 | 4.6 | 1.84 | 3.0 | Q345R | 24 | 0.92 |
图6 钢管Mises应力最大值随脱空面积的变化曲线Fig.6 The change curve of the maximum Mises stress of steel pipe with the empty area |
表3 脱空深度敏感性分析计算参数表Tab.3 Calculation parameter table for sensitivity analysis of empty depth |
方案 | 部位 | 管道直径/ m | 设计内水压力/MPa | 围岩单位弹性抗力系数/(kN·cm-3) | 钢材种类 | 钢板壁厚/ mm | 脱空面积/ m2 |
---|---|---|---|---|---|---|---|
1 | 上平段(Ⅲ类围岩) | 5.8 | 1.32 | 3.0 | Q345R | 22 | 1.0 |
2 | 上平段(Ⅳ类围岩) | 5.8 | 1.32 | 1.0 | Q345R | 22 | 1.0 |
3 | 中平段(Ⅲ类围岩) | 5.8 | 3.89 | 3.0 | 07MnMoVR | 26 | 2.0 |
4 | 中平段(Ⅳ类围岩) | 5.8 | 3.89 | 1.0 | 07MnMoVR | 34 | 2.0 |
5 | 下平段 | 4.8 | 7.45 | 1.0 | Q690CF | 54 | 1.0 |
6 | 尾水支管 | 4.6 | 1.84 | 3.0 | Q345R | 24 | 1.0 |
图8 钢管Mises应力最大值随缝隙值的变化曲线Fig.8 The variation curve of the maximum Mises stress of steel pipe with the gap value |
1 |
陈观福,伍鹤皋,熊德炎. 地下埋管式压力钢管非线性有限元分析[J]. 武汉水利电力大学学报,1999(6):3-5.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
2 |
申艳,李晓,邵艳妮,等. 月牙肋钢岔管结构优化及联合承载机理研究[J]. 中国农村水利水电,2016(4):154-157.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
3 |
张淑婵,傅金筑. 水电站压力钢管与混凝土之间的接触灌浆[J]. 西北水电,2009(1):9-15.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
4 |
李杰,段利君. 长龙山抽水蓄能电站压力钢管接触灌浆技术研究[J]. 人民长江,2019,50():194-195,329.
增刊1
{{custom_citation.content}}
{{custom_citation.annotation}}
|
5 |
韩守国. FUKO管在小浪底工程压力钢管接触灌浆中的应用[J]. 人民黄河,2000(1):42-43.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
6 |
裴少英,涂善波,高拴会. 蜗壳钢衬下混凝土脱空缺陷检测中中子无损探测法的应用[J]. 物探与化探, 2013,37(2):363-367.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
7 |
晏国顺,张富家,王旭明. 中子无损检测法在泸定水电站蜗壳脱空检测中的应用[J]. 水力发电,2011,37(5):83-84,88.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
8 |
中华人民共和国水利部. 水工建筑物水泥灌浆施工技术规范: SL 62-2014 [S]. 北京:中国水利水电出版社,2014.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
9 |
国家能源局, 水工建筑物水泥灌浆施工技术规范: DL/T 5148-2012 [S]. 北京:中国电力出版社,2012.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
10 |
杨峰,张丹,宿生,等. 海南琼中抽水蓄能电站压力钢管帷幕灌浆孔焊接封堵工艺及改进[J]. 水力发电,2019,45(1):93-96.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
11 |
中华人民共和国水利部. 水电站压力钢管设计规范: SL 281-2003 [S]. 北京:中国水利水电出版社,2003.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
12 |
国家能源局. 水电站压力钢管设计规范[S]: NB/T 35056-2015. 北京:中国电力出版社,2016.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
13 |
莫维尼. 有限元分析[M]. 北京:电子工业出版社,2015.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
{{custom_ref.label}} |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
/
〈 |
|
〉 |