水力发电机组甩负荷过渡过程的参数敏感性分析
谢卓健, 闫懂林, 肖汉, 麦先春, 王峻峰, 陈启卷
水力发电机组甩负荷过渡过程的参数敏感性分析
Parameter Sensitivity Analysis of Transition Process for Hydraulic Generating Set
以国内某水电站为对象,在不确定框架下构建了水力发电机组甩负荷过渡过程的数学模型。并以此模型为基础,引入扩展傅里叶幅度检验法量化输入参数对系统响应的影响,获得了机组在甩负荷过渡过程中输入参数相对于转速、水击压力以及调压室涌浪的敏感性特性。可以得到飞轮力矩对转速最大上升值的影响最为显著。同时,也可以发现各参数的不确定度会明显影响对水击压力的敏感性,而不会影响对调压室涌浪的敏感性。
Taking a hydropower station in China as an example, a mathematical model of load rejection process of hydroelectric generating units is constructed under the uncertain framework. Based on this model, an Extended Fourier Amplitude Sensitivity Test is introduced to quantify influences of input parameters on the system response, and sensitivity characteristics of input parameters relative to the rotational speed, water hammer pressure and surge in the surge-chamber during the load rejection transition are obtained. It can be concluded that the flywheel torque has the most significant effect on the maximum speed appreciation. At the same time, it can be found that the uncertainty of each parameter will obviously affect the sensitivity to the water hammer pressure, but will not affect the sensitivity to the surge in the surge chamber.
水力发电机组 / 甩负荷 / 全局敏感性 / 扩展傅里叶幅度检验法 {{custom_keyword}} /
hydroelectric generating set / load shedding / global sensitivity / Extended Fourier Amplitude Sensitivity Test {{custom_keyword}} /
表1 仿真参数Tab.1 Simulation parameters |
参数 | 符号 | 值 |
---|---|---|
机组飞轮力矩/(t·m2) | GD 2 | 65 000 |
调压室阻抗孔面积/m2 | As 1 | 58.205 |
调压室第一段面积/m2 | As 2 | 801.975 |
调压室第二段面积/m2 | As 3 | 2 280.975 |
调压室第三段面积/m2 | As 4 | 2 562 |
调压室流入系数 | r 1 | 3.564e-5 |
调压室流出系数 | r 2 | 3.564e-5 |
引水隧洞波速/(m·s-1) | a 1 | 1 100 |
引水隧洞摩擦系数 | f 1 | 0.03 |
引水隧洞面积/m2 | A 1 | 162.163 9 |
调压井至钢管下平段首波速/(m·s-1) | a 2 | 1 166.667 |
调压井至钢管下平段首摩擦系数 | f 2 | 0.02 |
调压井至钢管下平段首面积/m2 | A 2 | 74.365 2 |
钢管下平段首至机组段波速/(m·s-1) | a 3 | 1 065 |
钢管下平段首至机组段摩擦系数 | f 3 | 0.005 |
钢管下平段首至机组段面积/m2 | A 3 | 52.738 9 |
尾水管段波速/(m·s-1) | a 4 | 1 025 |
尾水管段摩擦系数 | f 4 | 0.01 |
尾水管段面积/m2 | A 4 | 62.841 1 |
尾水管延伸段波速/(m·s-1) | a 5 | 1 107.33 |
尾水管延伸段摩擦系数 | f 5 | 0.044 |
尾水管延伸段面积/m2 | A 5 | 141.761 8 |
1 |
周建平,杜效鹄,周兴波.全球水电开发现状及未来趋势[J].中国电业,2020(7):26-29.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
2 |
张良君,李小阳.水电站压力钢管水压试验安全质量事故分析[J].中国科技信息,2014(8):251-253.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
3 |
黄菊珠.山美水电站机组甩负荷事件分析[J].广西水利水电,2020(4):87-89.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
4 |
曲东.平班水电站甩负荷试验异常分析及处理[J].红水河,2015,34(3):46-49.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
5 |
张伟.西溪电站机组甩负荷试验故障分析[J].水电站机电技术,2006(2):44-45.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
6 |
付亮,王义国.有调压井水电站甩负荷试验与仿真分析[J].水电能源科学,2012,30(6):154-157.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
7 |
王威,王知行,钟师胜.伊朗卡仑I水电站机组甩负荷过渡过程的数值模拟计算[J].大电机技术,2005(3):44-48,52.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
8 |
叶文波,王煜,姜锋,等.水电站甩负荷大波动过渡过程模拟[J].水电自动化与大坝监测,2015,39(1):4-6,37.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
9 |
陈胜,张健,俞晓东.水电站输水系统相继甩负荷下调压室涌浪叠加研究[J].水利学报,2015,46(11):1 321-1 328.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
10 |
张洋,杨建东,郭文成.设气垫式调压室的超长引水隧洞水电站大波动过渡过程探讨[J].大电机技术,2016(4):42-48,64.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
11 |
何亮,侯英雨,赵刚,等.基于全局敏感性分析和贝叶斯方法的WOFOST作物模型参数优化[J].农业工程学报,2016,32(2):169-179.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
12 |
姜书鹏,乔颖,徐飞,等.风储联合发电系统容量优化配置模型及敏感性分析[J].电力系统自动化,2013,37(20):16-21.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
13 |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
14 |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
15 |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
16 |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
17 |
邢会敏,相诗尧,徐新刚,等.基于EFAST方法的AquaCrop作物模型参数全局敏感性分析[J].中国农业科学,2017,50(1):64-76.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
18 |
李艳,黄春林,卢玲.基于EFAST方法的SEBS模型参数全局敏感性分析[J].遥感技术与应用,2014,29(5):719-726.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
19 |
陈家远.水力过渡过程的数学模拟及控制[M].成都:四川大学出版社,2008.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
20 |
叶文波. XW水电站水力机组大波动过渡过程研究[D].2015.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
{{custom_ref.label}} |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
/
〈 |
|
〉 |