大古水电站大坝岸坡坝段温度应力特性及浇筑温度影响分析
陈亮, 颉志强, 王首豪
大古水电站大坝岸坡坝段温度应力特性及浇筑温度影响分析
An Analysis of the Temperature Stress Characteristics and Pouring Temperature Influence of Bank Slope Dam Section of DG Hydropower Station
研究和实践表明,控温浇筑与表面保温、通水降温都是重要的混凝土大坝施工防裂措施。然而,严格的浇筑温度控制指标,大多需要骨料风冷及加冰拌和来实现,会大幅增加混凝土生产成本。以地处高海拔地区的大古水电站岸坡坝段为研究对象,采用三维有限元法,系统研究了岸坡坝段混凝土施工期温度、应力及开裂特性。在此基础上,通过多工况仿真,比较了浇筑温度对岸坡坝段不同部位开裂特性的影响。结果表明,对于该工程而言,上下游面机拌变态混凝土需要严格控制浇筑温度,但坝体内部碾压混凝土浇筑温度可在设计指标基础上适当提高2~5 ℃。
Research and engineering practice show that pouring temperature control is as important as surface insulation and water cooling for cracking-preventing of the concrete dam. However, most of the strict pouring temperature control indicators need the air cooling and ice mixing of aggregates, which will greatly increase the cost of concrete production. Taking the RCC dam bank slope dam section of DG hydropower station located at high altitude as the research object, this paper systematically studies the temperature, stress and cracking characteristics of the bank slope dam section concrete during construction by using the three-dimensional finite element method. On this basis, the effects of pouring temperature on the cracking characteristics of different parts of the dam are compared through multi-condition simulation. The results show that for the project, the pouring temperature of machine mixed abnormal concrete on the upstream and downstream surfaces needs to be strictly controlled, but the pouring temperature of RCC in the dam body can appropriately increase by 2~5 ℃ based on the design index.
碾压混凝土 / 岸坡坝段 / 温度应力 / 浇筑温度 {{custom_keyword}} /
roller-compacted concrete / bank slope dam section / temperature stress / pouring temperature {{custom_keyword}} /
表1 混凝土配合比及弹性模量Tab.1 Mix proportion and elastic modulus of concrete |
混凝土 | 类型 | 级配 | 水灰比 | 粉煤灰掺量/% | 容重/(kg·m-3) | 泊松比 | 抗压弹模/GPa | 抗压强度/MPa | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7 d | 28 d | 90 d | 180 d | 7 d | 28 d | 90 d | |||||||
R9015 | 碾压 | 三级 | 0.55 | 60 | 2 420 | 0.167 | 10.6 | 15.6 | 19.9 | 21.7 | 8.1 | 13.3 | 21.8 |
R9020 | 碾压 | 二级 | 0.50 | 50 | 2 400 | 0.167 | 14.4 | 18.7 | 23.6 | 24.2 | 11.4 | 19.4 | 29.1 |
C9020 | 常态 | 三级 | 0.50 | 25 | 2 380 | 0.167 | 16.3 | 19.3 | 22.3 | 23.9 | 15.7 | 25.1 | 31.7 |
表2 混凝土热学性能参数Tab.2 Thermal performance parameters of concrete |
类型 | 导温系数/(10-3 m2·h-1) | 导热系数/[kJ·(m·h·℃)-1] | 比热/[kJ·(kg·℃)-1] | 线胀系数/×10-6/℃ | 绝热温升/℃ |
---|---|---|---|---|---|
R9015 | 2.46 | 5.58 | 0.938 | 7.9 | |
R9020 | 2.62 | 6.06 | 0.964 | 8.0 | |
C9020 | 2.77 | 6.64 | 1.012 | 8.1 | |
表3 浇筑温度控制值Tab.3 Pouring temperature requirements |
浇筑时间 | 0<h≤0.2 L (强约束区) | 0.2 L<h≤0.4 L (弱约束区) | h>0.4 L (自由区) | |||
---|---|---|---|---|---|---|
常态 | 碾压 | 常态 | 碾压 | 常态 | 碾压 | |
11月中旬-次年3月中旬 | ≥6 ℃ | ≥6 ℃ | ≥6 ℃ | ≥6 ℃ | ≥6 ℃ | ≥6 ℃ |
3月下旬及10月中旬-11月上旬 | 自然入仓 | 月均气温+3 ℃ | 自然入仓 | 月均气温+3 ℃ | 自然入仓 | 月均气温+3 ℃ |
4月上旬-10月上旬 | ≤12 ℃ | ≤12 ℃ | ≤14 ℃ | ≤14 ℃ | ≤16 ℃ | ≤16 ℃ |
表4 表面保温要求Tab.4 Surface insulation requirements |
位 置 | 时 段 | |
---|---|---|
4月下旬-10月上旬 | 10月中旬-次年4月 | |
上下游面 | 上下游表面采用5 cm厚的聚苯乙烯(EPS)板保温 | 贴保温材料(5 cm聚苯乙烯板);钢模板外嵌贴3 cm厚聚苯乙烯板 |
仓面保温 | 仓面采用2 cm保温被进行仓面保温 | 采用4 cm保温被进行仓面保温 |
表5 各浇筑层平均温度统计Tab.5 Summary of average temperature of each pouring layer |
高程范围/m | 峰值温度/℃ | 一冷结束温度/℃ | 降温速率/(℃·d-1) | 越冬后温度/℃ |
---|---|---|---|---|
3 356.0~3 358.0 | 22.39 | 17.57 | 0.24 | 11.53 |
3 358.0~3 359.5 | 21.73 | 17.31 | 0.21 | 13.85 |
3 359.5~3 361.0 | 21.88 | 17.29 | 0.22 | 13.50 |
3 361.0~3 362.5 | 21.78 | 17.30 | 0.22 | 13.56 |
3 362.5~3 364.0 | 21.75 | 17.34 | 0.22 | 13.52 |
3 364.0~3 365.0 | 21.33 | 17.85 | 0.15 | 13.31 |
3 365.0~3 366.5 | 21.37 | 17.97 | 0.16 | 13.33 |
3 366.5~3 368.0 | 22.09 | 17.63 | 0.21 | 13.77 |
3 368.0~3 369.5 | 21.86 | 17.73 | 0.21 | 13.38 |
3 369.5~3 371.0 | 22.03 | 17.77 | 0.21 | 13.36 |
3 371.0~3 372.5 | 22.10 | 17.73 | 0.22 | 13.25 |
3 372.5~3 374.0 | 22.18 | 17.58 | 0.23 | 13.33 |
3 374.0~3 375.0 | 21.36 | 19.13 | 0.10 | 13.23 |
图3 不同高程特征点最高温度Fig.3 Maximum temperature of typical points at different elevations |
图10 不同高程特征点最大主应力Fig.10 Maximum temperature of typical points at different elevations |
图14 浇筑温度对中心特征点最大应力影响Fig.14 Influence of pouring temperature on maximum stress of center typical points |
图15 浇筑温度对上游面特征点最大应力的影响Fig.15 Influence of pouring temperature on maximum stress of upstream typical points |
1 |
李新宇,谢国帅,姜宏军. 西藏大古水电站原材料优选与混凝土性能试验[C]// 国际碾压混凝土坝技术新进展与水库大坝高质量建设管理—中国大坝工程学会2019学术年会论文集. 北京:中国三峡出版社, 2019:247-253.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
2 |
姜宏军,吴世勇,周廷清,等. 西藏大古水电站RCC重力坝温控及防裂设计研究[C]//国际碾压混凝土坝技术新进展与水库大坝高质量建设管理—中国大坝工程学会2019学术年会论文集. 北京:中国三峡出版社, 2019:125-132.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
3 |
蒋小健,秦明豪,王立成. 新疆某工程碾压混凝土坝施工期温控防裂[J]. 大坝与安全,2020(4):57-63.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
4 |
苏鹏,王荣荣,王晓峰,等. 西藏高海拔寒冷地区碾压混凝土筑坝影响因素及施工温控措施[J]. 红水河, 2020(2):15-19.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
5 |
蔡畅,路明.大古水电站碾压混凝土试验研究[J].水利建设与管理,2020(3):45-52,79.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
6 |
胡中阔.西藏高海拔复杂气候条件下碾压混凝土筑坝关键技术[J].红水河,2021(4):6-11,31.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
7 |
朱伯芳. 大体积混凝土温度应力与温度控制[M]. 北京: 中国电力出版社, 1999.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
8 |
林鹏,李庆斌,周绍武,等. 大体积混凝土通水冷却智能温度控制方法与系统[J]. 水利学报, 2013,44(8):950-957.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
9 |
张磊,王建,范瑞朋,等.基于智能温控的混凝土坝个性化温控优化方法研究[J].水利水电技术(中英文),2021,52(8):11-16.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
10 |
朱岳明,贺金仁,刘勇军. 龙滩高RCC重力坝夏季不同浇筑温度的温控防裂研究[J]. 水力发电, 2002(11):32-36,73.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
11 |
杨映,景霞娟,朱振泱.高寒地区混凝土坝高温度峰值区域的温控防裂[J].水利水电技术(中英文),2021,52(8):17-26.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
12 |
盛瑶. 考虑粉煤灰掺量的碾压混凝土绝热温升试验及温控仿真研究[D]. 西安:西安理工大学,2021.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
13 |
任喜平. 三河口碾压混凝土大坝浇筑温度有限元分析[J]. 人民黄河, 2021,43(6):131-135.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
14 |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
15 |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
16 |
颉志强. 多CPU+多GPU 并行在温度应力仿真分析中的应用[R]. 武汉:长江科学院, 2016.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
17 |
颉志强. 水工混凝土温控仿真若干关键算法研究及应用[D]. 南京:河海大学, 2012.
{{custom_citation.content}}
{{custom_citation.annotation}}
|
{{custom_ref.label}} |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
/
〈 |
|
〉 |