滇中引水二期工程伍庄村分水口衔接段水力响应及控制研究
Study on the Hydraulic Response and Control of the Connecting Section of Wuzhuang-village Turnout in the Phase-II Project of the Central Yunnan Water Diversion Project
中国农村水利水电
.
2022, (6): 245
-250
.
|
|