高原长隧的钻爆和TBM联合开挖进度仿真模型
张涛, 梁志强, 王飞, 刘全, 杨凯
Progress Simulation Model of Plateau Long Tunnel Excavated by the Combined Method of the DB and TBM
ZHANG Tao, LIANG Zhi-qiang, WANG Fei, LIU Quan, YANG Kai
中国农村水利水电 . 2025, (1): 209 -214 .  DOI: 10.12396/znsd.240244