|
基于施工开挖全过程的管片衬砌承载机理及豆砾石回填时机研究
Load-Bearing Mechanism of Segment Lining and Optimal Timing for Pea Gravel Backfilling Based on the Full Construction Excavation Process
中国农村水利水电
.
2026, (1): 203
-208
.
DOI: 10.12396/znsd.2500319
|
|