|
Construction Timing Optimization for In-situ Rehabilitation of Urban Box Culverts: An Integrated AHP-OPA Multi-Criteria Decision-Making Approach
China Rural Water and Hydropower
.
2026, (5): 241
-245
.
DOI: 10.12396/znsd.2500929
|
|